
Energy & Engineering Audit
Assignments handled during the last five years
-
Energy audit at weaving clusters
-
Energy usage indices in textile mills
-
Study for setting up of standards and norms for designated consumers in textile industry
-
Electrical energy studies in a modern weaving unit
-
Assessment study on energy conservation
-
Thermal energy audit studies
-
Electrical energy audit studies
-
Stenter audit for a textile mill
-
Coal consumption audit for a textile unit
-
Engineering audit for a modern process house covering aspects such as process, utilisation and machinery maintenance records
-
Detailed energy report for rubber manufacturing units
-
Progress report on energy efficiency improvement and implementation
-
Preliminary audit on fuel, electricity and water conservation for a process house
-
Reasons for electrical failure in rapier looms
-
Thermal insulation audit for a textile unit
-
Audit of assessment and reutilisation of recovered heat from various sources
-
Studies on compressed air system
-
Rationalisation of condensate recovery system
-
Heat output of thermic fluid heating system
-
Improving boiler performance
-
Efficiency trial on a Thermopac
-
Study on new boiler
-
Checking combustion of boilers and thermopacs
-
Testing of boiler and thermic fluid heater
-
Steam trap operation testing
-
Boiler monitoring
